Use when a task needs the judgment of a Power Distributor and Dispatcher — diagnosing a frequency or Area Control Error (ACE) deviation after a generation trip, deciding the escalation order from economic redispatch through emergency load shed, verifying N-1 contingency reserve is restored after an event, or distinguishing a real-power (frequency) problem from a reactive-power (voltage) problem.